BriefTransport· North Vancouver

Bowinn Ma urges province to fund Metrotown-North Shore bus line, backs SkyTrain long term

The North Vancouver-Lonsdale MLA wants the new government to move on TransLink's 21-km BRT line, though the trip would still take about an hour at best.

Reported by Daily Hive Vancouver; TransLink and provincial confirmation pending.

A articulated rapid transit bus travelling on a city roadIllustrative photo
A articulated rapid transit bus travelling on a city road. Photo: Albert Stoynov / Unsplash · Unsplash License

Riders can now take the R2 RapidBus from Park Royal to Metrotown without transferring, but the trip still takes 60 to 80 minutes. BC NDP MLA Bowinn Ma wants the new provincial government to fund a 21-km bus rapid transit upgrade and start construction immediately, Daily Hive Vancouver reported.

In a Nov. 19, 2026 social media post, Ma, the re-elected MLA for North Vancouver-Lonsdale, urged Transportation and Infrastructure Minister Trevor Halford to reach an agreement with TransLink. She also named SkyTrain as her choice for the permanent North Shore solution. TransLink and the North Shore municipalities are still studying long-term options. A 2023 McElhanney study for the District of North Vancouver put SkyTrain at 23 minutes from Park Royal to Metrotown.

TransLink said the extended R2 logged about 434,000 boardings from Sept. 8 to Oct. 7, up 160 per cent from a year earlier. Average weekday boardings rose from about 6,000 to more than 16,000.

The BRT would add dedicated bus-only lanes, though buses would still share the Ironworkers Memorial Bridge with other traffic. TransLink earlier estimated peak trips could drop to 60 minutes, a saving of up to 20 minutes.

TransLink has design and planning money but needs significant construction funding, and it has not released a firmer cost. Its first three BRT lines were once pegged at $250 million to $300 million each; King George Boulevard is now about $700 million. Some Burnaby Heights businesses oppose losing curbside parking on Hastings Street, and TransLink expects to choose the Brentwood route in 2027.

Sources

Facts first. Context second. Sources always. This story was prepared with AI assistance from the sources listed above and reviewed by a Northline editor before publication. How we use AI · Report an error